Cappella Embassy or “Capella Embassy”? The Name, and What Changed from D'Rapport
卡佩拉大使馆公寓还是 Capella Embassy?正名与 D'Rapport 的转变
The correct name is Cappella Embassy — spelled with a double “p”. Online it is widely searched as “Capella Embassy” (single p) and “The Capella Embassy”; all of these refer to the same five-tower residence on Jalan Nipah, off Jalan Ampang, in Ampang Hilir. If you arrived using any of these spellings, you are in the right place.
The development was originally launched as D'Rapport Residences and completed in 2022. Built by China Railway Engineering Corporation (CREC) and now repositioned by TSLAW Land, it is being elevated under the Cappella Embassy brand — with a comprehensive upgrade of facilities, finishes and landscaping while the generously sized residences themselves remain unchanged.
正确名称为 Cappella Embassy(双写 p)。网络上常被搜索为 Capella Embassy(单 p)或 The Capella Embassy,皆指安邦希尔 Jalan Nipah 的同一座五塔住宅。项目原名 D'Rapport Residences,2022 年竣工,由中国中铁(CREC)建造,现由 TSLAW Land 全面升级为 Cappella Embassy。
Read the FAQ · 常见问题 →